(HBO) - The Hoa Binh Power Company is implementing specific plans to respond to natural disasters and floods under the direction by the Electricity of Vietnam Group (EVNSPC)’s Northern Power Corporation under the motto of "four on-site duties”


Staff of the province’s electricity sector inspecting the backup material plan to ensure supply in the rainy season in 2018.

 

Electricity industry is a specific economic sector in Hoa Binh. It is prone natural disasters. The disaster prevention, search and rescue work is considered as a key task of the Hoa Binh Power Company.

 The firm has rolled out a disaster response scheme at an early date, which was approved by the Northern Power Corporation. On the basis of the scheme, the firm’s branches were assigned to swiftly solve incidents, thus ensuring safe power re-supply to local residents.

 The company has planned for the disaster prevention, search and rescue work and assigned its branches with specific works. It has also prepared backup equipment in areas that enable replacement. For large-sized equipment, the company signed contracts of equipment supply with capable units.

 The power supply modes were also detailed, including the basic and circular power supply ones, to ensure no power interruption on the large scale.

 Units have set up task force for overcoming disaster consequences. Scenarios and plans to respond to natural disasters are very close to the reality. 


The Hoa Binh Power Company has actively inspected and reinforced infrastructure facilities after disasters, helping minimize the damage.

Thanks to the careful preparations, the firm effectively overcame consequences caused by floods for the electricity industry in 2017, especially for infrastructure systems and power work.

Additionally, the company has also focused on implementing plans for setting up resettlement areas in areas vulnerable to natural disasters. The firm has coordinated with other localities’  authorities to build disaster prevention schemes and detailed electricity supply plans so as to be able to supply electricity as soon as possible after incidents./.

 

Related Topics


Kim Boi district maintains stable, sustainable economic development in forestry

Anyone found to be encroaching upon the forest, even if it is just one bamboo shoot, will face penalties. This commitment has been unanimously added into the covenant of Bua Cau hamlet, Hung Son commune in Kim Boi district, to protect the forest.

Hoa Binh Power Corporation gears up for hot season

The Hoa Binh Power Corporation (PC Hoa Binh) has applied synchronous measures to gear up for the coming summer season when power consumption demand surge may cause a risk of power supply disruption.

Starting business from hometown specialty

Appreciating the abundant potential and strengths of his hometown for tourism development, Ha Cong Hung, Deputy Secretary of the youth union of Mai Chau district’s Mai Hich commune, embarked on producing smoked meat with a desire to introduce his homeland's specialty to domestic and international tourists.

Huge potential to boost chilli export to RoK

Hoa Binh farmers are investing big in their chilli pepper cultivation areas after the first batch of 7.5 tonnes of pickled chilli peppers was shipped to the Republic of Korea (RoK) by Tien Ngan Trade and Investment Co., Ltd last month.

Hoa Binh improves effectiveness of collective economy

Recognising the role and importance of developing the collective economy, the northern province of Hoa Binh has promptly issued support policies to propel the development of the economy, making important contributions to local socio-economic development.

PM attends groundbreaking ceremony for electronic PCB factory in Hoa Binh

Prime Minister Pham Minh Chinh attended a groundbreaking ceremony for an electronic printed circuit board (PCB) factory at Da River Left Bank Industrial Park in Hoa Binh province on April 13. The electronic PCB factory is invested by Japan's Meiko Group at a total cost of 200 million USD.